English

18-11-2020
In mid-2020, hard-line Islamist group Hayat Tahrir Al-Sham (HTS) started pressuring the Hurras Al-Deen group to leave the Christian village of Al-Ghassaniyeh in the countryside west of Jisr Al-Shughour, in the Idlib governorate. This pressure came amid a campaign by HTS to secure the passage of joint Russian-Turkish military patrols on either side of the M4 Aleppo-Lattakia Highway.
11-11-2020
In the predominantly Alawite coastal city of Jableh, in the Lattakia Governorate, the City Council announced last week that it had completed all preparations for launching a new industrial zone project within the city, despite the existence of another industrial zone on its outskirts.
11-11-2020
Residents of Deir Dama, a village in rural north-western Suweida, have been displaced from their homes since 2014. Despite massive destruction wrought on the village by military confrontations, their failure to return is also linked to local conflicts between Druze and Bedouins who live in the area.
11-11-2020
The local council in the northern Aleppo city of Al-Rai held a public auction at its headquarters in mid-October, with the participation of 20 farmers, to rent out agricultural lands managed by the opposition-run body.
11-11-2020
To address real estate issues in informal settlements, legislative authorities in Syria issued the Real Estate Development and Investment Law No. 15 of 2008 and the Urban Planning and Urbanisation Law No. 23 of 2015, which are similar yet differ in a number of aspects.

عربي

20-01-2021
تحاول ميليشيا لواء القدس الفلسطينية المتمركزة في حلب، الهيمنة على مخيم النيرب لللاجئين الفلسطينيين في حلب والذي يُعتبر المهد الذي انطلق منه اللواء قبل 9 سنوات.
20-01-2021
ما زال الحصول على موافقة أمنية مسبقة من المخابرات العامة "أمن الدولة" هو الشرط اللازم لعودة الأهالي إلى بلدة حجيرة جنوبي دمشق.
20-01-2021
حظي حق الملكية بالحصة الأكبر من الإهتمام في التشريع السوري، بينما حظي حق الحيازة باهتمام أقل، في حين غاب حق السكن بشكل شبه كامل.
13-01-2021
استأنفت محافظة دمشق خلال الأسابيع الماضية، دفع بدلات الإيجار المتأخرة لمستحقي السكن البديل في مشروع ماروتا سيتي، عن عام 2020 وجزء من عام 2019، وذلك بعد انقطاع طويل. وبررت المحافظة التأخير في الدفع بسبب جائحة كورونا، رغم أن هذا التأخير ليس الأول من نوعه خلال السنوات الماضية.